Foundations and ADU Slabs

ADU foundations and building slabs in Long Beach and Lakewood

A foundation is built to an engineer's plan and passes city inspection before any concrete arrives. We pour from approved plans, coordinate inspections, and leave the slab ready for your framer.

Typical time
2 to 5 days
Crew placing concrete over a rebar grid with a pump hose

What foundations and adu slabs covers

Plan review and site layout

  • Reviewing approved structural engineering plans and soil reports
  • Laying out building setback lines, corners, and diagonal squareness
  • Coordinating plumbing and electrical sub-slab conduit sleeves
  • Digging perimeter footings to specified depth and width

Vapor retarder and steel reinforcement

  • Heavy-duty 10 to 15 mil under-slab vapor retarder taped at seams
  • Rebar grade and sizing installed exactly per structural schedules
  • Hold-downs, anchor bolts, and mudsill hardware set to layout
  • Scheduling and passing city pre-pour structural inspections

Concrete placement and testing

  • Concrete mix strength (2,500 to 4,000 PSI) batched to engineering specs
  • Consolidation with mechanical vibrators to prevent voids or honeycombing
  • Smooth trowel finish ready for framers and flooring installers
  • Moisture curing guidance and handoff to the general contractor

How the work goes

  1. 01Engineering reviewWe review your approved plans, foundation schedules, and site access restrictions.
  2. 02Excavation and sleevesFootings are excavated, plumbing rough-ins verified, and vapor barriers placed.
  3. 03Steel rebar and inspectionRebar, anchor bolts, and hold-downs are installed, followed by city inspection sign-off.
  4. 04Pouring and finishingConcrete is placed, consolidated, screeded flat, troweled, and cured for framing.
Freshly poured slab beside a concrete pump truck and mixer

Why clients choose us

Strict plan adherence

We pour exactly to your structural engineer's drawings, specifications, and rebar details.

Inspection coordination

We coordinate pre-pour inspections with Lakewood and Long Beach building inspectors.

Vapor barrier installation

Under-slab moisture retarders prevent ground dampness from damaging indoor finished flooring.

Flat framing surface

Precision leveling leaves your slab ready for immediate framing, sill plates, and plumbing.

Add-ons

  • Thickened slab edges for interior bearing walls
  • Equipment pads for HVAC condensers and heat pumps
  • Detached garage and shed concrete slabs
  • Concrete pumping for properties with limited backyard access

Before we start

  • Provide a copy of approved architectural and structural engineering plans.
  • Complete underground plumbing and electrical trenching before slab forming.
  • Ensure unobstructed driveway access for ready-mix concrete trucks and pump equipment.

Questions people ask

Call (657) 300-7519 for anything else.

Three-person crew raking base and finishing a new slab next to the house

Do ADU foundations require city building permits?

Yes. Accessory dwelling units are residential living spaces that require approved city plans and pre-pour structural inspections before concrete placement.

What is the difference between slab-on-grade and continuous footings?

A slab-on-grade combines the floor and perimeter footing into a single monolithic pour. Continuous footings feature deeper perimeter foundation walls poured before or separate from the floor slab.

How long must a new foundation cure before framing begins?

Framing can often commence after 3 to 7 days once concrete reaches adequate strength, though the slab continues curing and strengthening for 28 days.

Can you pour smaller concrete pads for backyard sheds or equipment?

Yes. We pour reinforced utility and shed slabs. Send your dimensions and location to discuss specifications and permit requirements.