A driveway carries a 4,000-pound car every day, plus the occasional delivery truck. Thickness, base, and reinforcement matter more here than anywhere else around the house, and that is where we put the effort.

Typical time
1 to 3 days
Wide new concrete driveway in front of a two-story home with a three-car garage

What driveways covers

Demolition and base preparation

  • Breaking out and hauling away old cracked concrete or asphalt
  • Cutting out invasive tree roots that lifted the former slab
  • Compacting a gravel aggregate base tailored to local soil
  • Grading surface drainage away from the garage threshold

Slab engineering and reinforcement

  • 4-inch standard slab for cars, or 5 to 6 inches for trucks and RVs
  • #3 or #4 steel rebar grid on chairs to maintain positioning
  • Panel control joints laid out every 8 to 10 feet to manage shrinkage
  • Thickened perimeter edges along driveway borders and approaches

Approaches and municipal compliance

  • City permit and inspection coordination for public right-of-way approaches
  • ADA-compliant transition angles at sidewalk intersections
  • Broom, stamped, or exposed aggregate finish options
  • Complete debris haul-away and site cleanup

How the work goes

  1. 01Site visit and load assessmentWe inspect your vehicles, soil conditions, tree root proximity, and property lines to determine slab thickness.
  2. 02Demo and excavationOld concrete is broken out and hauled away, roots are trimmed, and the sub-base is compacted.
  3. 03Forming and rebar gridForms are aligned, garage threshold grades verified, and rebar is tied on support chairs.
  4. 04Pouring, finishing, and curingHigh-strength concrete is poured, leveled, broom-finished for traction, and jointed.
Stamped and stained concrete driveway in front of a garage

Why clients choose us

Engineered slab thickness

We specify 4 to 6 inch depths based on your actual vehicles, from compact sedans to heavy work trucks.

Steel rebar on chairs

We lift and chair steel grids above the dirt so reinforcement sits centered inside the hardened slab.

Approach permit expertise

We assist with Lakewood and Long Beach public right-of-way requirements for sidewalk and apron work.

Root mitigation

We remove lifting tree roots and can install edge root barriers to protect your investment.

Add-ons

  • 5-inch or 6-inch heavy vehicle and RV parking pad thickness
  • Stamped or colored decorative border ribbons
  • Driveway approach and public sidewalk replacement
  • Linear trench drains along garage entries
  • Root barrier installation along mature parkway trees

Before we start

  • Arrange alternative on-street parking for your household vehicles during the 7-day cure window.
  • Clear vehicles and items from the garage if you need access during construction.
  • Inform neighbors about temporary street parking or brief equipment noise during demolition.

Questions people ask

Call (657) 300-7519 for anything else.

Three-person crew raking base and finishing a new slab next to the house

How long before I can drive and park on a new concrete driveway?

You can walk on the surface after 24 to 48 hours. Keep passenger cars off for at least 7 days, and wait 14 days before parking heavy trucks, boats, or RVs.

Should I pour a 4-inch or 6-inch concrete driveway?

A 4-inch slab is standard for passenger cars and SUVs. If you regularly park heavy diesel pickup trucks, commercial vans, boats, or motorhomes, a 5 or 6 inch reinforced slab is recommended.

Why use steel rebar instead of wire mesh in a driveway?

Steel rebar tied on chairs maintains its height in the slab and delivers superior tensile strength. Rolled wire mesh often gets stepped down to the dirt during pouring, where it provides little reinforcement.

Do I need a city permit to replace my driveway?

Replacing the driveway on your private property often does not require a permit. However, if the project includes the driveway apron or sidewalk in the public right of way, City of Lakewood or Long Beach permits and inspections are required.